Used Complete Brewhouse for Beer year 2007 25 HL per Brew
Built by NERB (ESAU&HUEBER Germany) in 2007
Capacity: 25 hl per brew @ 12° plato
Brewing time:
Milling: 1 hour
Mashing: 2 hours
Lautering: 2 hours
Boiling: 1 hour
Whirlpool: 30 minutes
Cooling: 1 hour
Can produce all types of beers: Pilsner, Lager, IPA, strong beer (17hl / brew at 18° plato)
Automation: SIEMENS S7.
Control system by ZENON COPA DATA (Winbrew / Profibus)
The plant includes:
- 4 malt silos in fabric (6,5 tons each + hopper for special malts)
- 2 roll mill (capacity : 500 Kg / hour)
- Grist case of 800 kg capacity (on weighing scale)
- Mashing vessel
- Lauter tune (with Seepex spent grain expulsion system). Malt charge 160 Kg / m2 x 2,27m2= 360 Kg
- Boiling vessel / whirlpool + Varioboil system (vacuum boiling) with 4% evaporation rate.
- Automatic hop dosing system
- 2 stage wort cooler (capacity : 4000 litres / hour)
- Wort aeration
- 2 vessel CIP (steam heated) 2 x 300 litres
- Insulated hot water tank of 8000 litres (internal and external heating system)
- CERTUS steam boiler (500 kg / hour)